9 Operation and Maintenance Management

Prev Next

9.1 Operation and Maintenance Service Contents

Operation and maintenance include, but are not limited to:

  1. Equipment repair;

  2. The cost of materials, accessories, and equipment used;

  3. Emergency rescue and repair;

  4. Cost of technical transformation;

9.2 Operation and maintenance preparation

When performing routine maintenance on site, ensure that the system is in Shutdown mode. The following are instructions for mode switching operations. For details, see 8.3.1 Energy Storage Control.

In General mode, change Control Mode Switch from constant AC Power Mode to Stop.

20c1600k--manual16.png

In Separate mode, change the control mode of System 1#~8# from Constant AC power mode to Stop mode.

20c1600k--manual17.png

Disconnect the QF21~QF28 on primary distribution box(CB),and disconnect QF2K circuit breaker on distribution box(DB), and finally turn the high-voltage unit circuit breakers in all battery branches to the horizontal position, as shown in the following figure.

Figure 9-1 Off state

Note: The circuit breaker handle label (switch) does not rotate with the handle. 

NOTICE

To ensure the safety of personnel in the maintenance process, please complete the above operations before starting the operation and maintenance work. It is forbidden to skip the above operations and start the operation and maintenance work.

9.3 Operation and Maintenance Rules

The scope of operation and maintenance includes all equipment and accessories involved in the whole energy storage product, including but not limited to main equipment, electrical, automatic control, monitoring, fire protection, lighting, civil engineering, lightning protection, etc.

Operational monitoring

No.

Item

Content

Period

1

Working status

Charge/discharge/standby/sleep

Day

2

Active power

Charge/discharge power value

Day

3

Reactive power

The system reactive power output value

Day

4

Power factor

Grid side power factor value

Day

5

Grid frequency

Grid side frequency

Day

6

AC voltage

Grid side A, B, C three-phase voltage

Day

7

AC current

Three-phase currents on the grid side A, B and C

Day

8

DC voltage

DC bus voltage

Day

9

DC current

DC bus current

Day

10

Cell voltage

All cell voltages of the system (including the highest and lowest voltages and their corresponding unit numbers)

Day

11

Battery temperature

All battery packs of the system, pole temperatures (including the highest and lowest temperatures and their corresponding battery packs, pole numbers).

Day

12

SOC

System SOC and SOC for each string of batteries

Day

13

Communication

The communication status between the system dispatch control terminal, the conversion, the battery management system, and the environmental control system

Day

14

Alarm

AC frequency, phase sequence abnormality, DC side battery overvoltage/undervoltage, overcurrent, short circuit, over-temperature, and other status of alarm

Day

15

Fault

System dispatch control terminal, PCS , battery management system, air conditioning, fan, and other equipment failure status

Day


On-site inspection

No.

Item

Requirements/ Standards

Period

1

Containers and surroundings

The appearance of the container should be deformed and damaged without external forces, and the foundation should be free of subsidence

Quarter

2

conversion (PCS )

The indicator light and display should be displayed correctly, and the sound and temperature are normal during operation

Quarter

3

BESS control box

The indicators and display should be displayed correctly, and the terminals should be securely connected

Quarter

4

Battery rack

Rack indicators should be displayed normally, the high-voltage connectors should be securely connected, and communication connectors should be securely connected

Quarter

5

Battery Management System (BMS)

Acquisition, communication cables should be intact; and connector should be securely connected

Quarter

6

Network switch

The indicator light shows that the network port is securely connected

Quarter

7

System communication

All devices of the system communicate properly, and there is no offline

Quarter

8

Precision air conditioning

Air conditioning start/off OK;

Quarter

9

Fan

The fan should be switched on/off normally; no noise when running

Quarter

10

Duct

The duct should be free of foreign objects and kept unblocked

Quarter

11

Primary circuit

Each connection point should be secure and reliable, and free of looseness

Half

12

Secondary circuit

Each signal side connector, the terminal row should be securely connected, with no loose

Quarter

13

Temperature and humidity sensor

The data deviation is within the normal range

Quarter

14

Earthing

The grounding connection is reliable

Half

9.4 Regular Operation and Maintenance Work

9.4.1 Electrochemical energy storage power station

  1. Monitoring, regulating and inspecting the running state of electrochemical energy storage power station;

  2. Operation and parameter adjustment of energy storage products in electrochemical energy storage power station;

  3. Operation record of energy storage products in electrochemical energy storage power station;

  4. Data backup, statistics, analysis and reporting of electrochemical energy storage power station;

  5. Work ticket, operation ticket, shift handover, patrol inspection, regular test of equipment and implementation of rotation system;

  6. Original records, drawings and data management of energy storage products in electrochemical energy storage power station;

  7. Inspection, maintenance and management of building construction and assisted living facilities in electrochemical energy storage power station;

  8. Formulate countermeasures to prevent safety accidents of electrochemical energy storage power stations.

Daily operation of electrochemical energy storage plant equipment.

9.5 Storage and installation environment requirements

9.5.1 Storage requirement

  1. a) Storage temperature: -20~+55℃ (Short-term storage: 1 month), 0℃~35℃(long-term storage: 1 year) After 12 months of storage at the recommended storage temperature, the irreversible capacity loss of lithium batteries is generally 3%~10%.

  2. b) Relative humidity: No more than 95%, non-condensing;

  3. c) No explosive media shall be allowed in the place of storage;

  4. d) No strong acid or alkali and other highly polluting substances that can be adhered to or inhaled by the equipment shall be allowed in the place of storage;

  5. e) The ground of the storage site is flat, and the height error of the contact surface between the ground and the box is less than 3mm.

  6. f) The storage and transportation time of the energy storage system shall not exceed 6 months in total (calculated from the time of shipment). Over 6 months, battery charging and SOC calibration must be carried out, and at least 60% SOC shall be supplemented. If the battery is not recharged as required, the performance and service life of the battery may be affected.

  7. g) When the storage time is 3 months or more, it can be put into use only after being inspected and tested by manufacturer support engineers.

  8. h) When the battery has not undergone charging and discharging cycles for 3 consecutive days, it is considered as in storage state.

In the storage state, the cell has self discharge (less than 0.1% per day). If not maintained for a long time, the SOC will become inaccurate. If the cell voltage is too low, it may cause cell damage (over discharge).

1) When the storage period is less than 10 days, please charging the battery and ensure that the minimum voltage of each cluster(string) cells is ≥ 3.30V before storage, and the "Standby" indicator light on the "Status" interface is green.

2) When the storage period is ≥ 10 days or more, please charging the battery and ensure that the minimum voltage of the cells in each cluster(string) is ≥ 3.36V before storage, and maintenance the system once a month.

3) Maintenance content: Check the minimum voltage of the cells on the "BMS Status" interface to ensure that the minimum voltage of each cluster(string) of cells is ≥ 3.36V, and the "Standby" indicator light on the "Status" interface is green. When the voltage is not met, please set BESS to charging mode until the minimum voltage of cell voltage is ≥ 3.36V.

4) When the system loses external power supply, please disconnect all circuit breakers and isolation switches of the system. After the power supply is restored, close all circuit breakers and isolation switches of the system and perform maintenance on the system.

9.5.2 Operation environment requirements

  1. a) Operating temperature: -20~40℃(Max.-35~45℃);

  2. b) Meet the requirements of Clause 3.4.1 of this Agreement;

  3. c) The container must be horizontally installed on a hardened foundation, with cable slots on the ground for easy routing;

  4. d) Do not install the equipment in low-lying areas to avoid flooding;

  5. e) The container must be placed in a well-ventilated area. No obstacles are allowed within 300mm of the air inlet and outlet.

  6. f) The area around the equipment should be protected according to local requirements to prevent non-personnel from approaching.

  7. g) Lightning protection measures should be placed around the equipment according to local or international standards and lightning protection requirements of the building or power plant equipment.

  8. h) If it is used in special environment (such as extremely cold, sandstorm, etc.), please explain the situation and contact us.

9.5.3 Energy Storage Devices

  1. a) Cleaning of energy storage converters, battery systems and battery management systems, wiring inspection, battery charging and discharging, etc.

  2. b) During maintenance of energy storage equipment, safety protection measures should be taken for the equipment and other related operating equipment to prevent accidental collision.

  3. c) Maintenance personnel are professionally trained, equipped with protective equipment, take protective measures, and use qualified insulation tools.

  4. d) Maintenance types can be divided into routine maintenance, regular maintenance and special maintenance:

1) Daily maintenance: temporary fault removal, including the process of inspection, cleaning, adjustment and replacement of parts, there is no fixed period of time, the completed maintenance and overhaul items should be recorded in the maintenance record, and management archives;

2) Regular maintenance: carry out comprehensive inspection, cleaning, testing, measurement and inspection of related equipment on a regular basis. The regular maintenance period is generally half a year or one year, and the period can be adjusted according to the actual situation; The regular maintenance items shall be carried out item by item. The completed maintenance and overhaul items shall be recorded in the maintenance records and managed and filed.

3) Special maintenance: maintenance of related equipment due to special requirements;

9.6 Fault Troubleshooting

No.

The fault status

Troubleshooting

1

The PCS is running too noisy

Check to make sure the converter power is within the permissible range, observe whether the voltage and current of the power network fluctuate, and check to replace the cooling fan.

2

Black screen

Check to make sure that the 24V power connector on the back of the touch screen is secure and does not loosen.

3

Communication failure of touch screen

Check the touch screen communication line and check that the main console is powered on.

4

The cell overvoltage

Check that the battery's overvoltage performance is correct and that the corresponding BMU/CMU circuit board is OK.

5

The battery or pole overtemperature

Check that the fan is on normally, check that the poles are loose, and check that the battery is insulated to the ground.

6

Overcurrent protection action

Check for short circuits.

7

Fuse protection

The output of the device exceeds the current limit and needs to check for short circuits and replace the quick melting fuse.